주 메뉴

R&D

Innovative industrial technology program

Development of Low·Medium Temperature Waste Heat Recovery Power Generation System for Vessels

Development of Low·Medium Temperature Waste Heat Recovery Power Generation System for Vessels
Period Jun. 1, 201~May 31, 2016
Objective
  • Development of a prototype 250KWe ORC system and conduct performance tests
  • Detail design of 1MWe ORC generation and power storage system for large vessels
  • Develop technologies for applying and evaluating the safety of ORC generation/storage systems in vessel applications

International Standardization of Precision Measurement Technology to Improve Ship Energy Efficiency and EEDI/EEOI and Development of Integrated Monitoring & Control Equipment to Cope with IMO GHG Emission Reduction Regulations

International Standardization of Precision Measurement Technology to Improve Ship Energy Efficiency and EEDI/EEOI and Development of Integrated Monitoring & Control Equipment to Cope with IMO GHG Emission Reduction Regulations
Period Jun. 1, 2012~May 31, 2017
Objective
  • Development of technology for demonstration and standardization of EEDI/EEOI
  • Development of integrated ship energy efficiency data management S/W · Development of EEDI demonstration/EEOI monitoring system

Development of key LNG Ship-to-Ship Bungkering Shuttle technology

Development of key LNG Ship-to-Ship Bungkering Shuttle technology
Period Jun.1, 2013~May 31, 2018
Objective
  • Development of key bunkering vessel technology for ship-to-ship charge of LNG of next-generation fuel for ship propulsion
  • LNG bunkering system engineering technology
  • Development of basic LNG bunkering system technology for bunkering vessels

Development of technology for test, evaluation and certification of 30MW electric propulsion system to improve efficiency of electrically propelled vessels.

Development of technology for test, evaluation and certification of 30MW electric propulsion system to improve efficiency of electrically propelled vessels.
Period Jun. 1, 2012~May 31, 2017
Objective
  • Develop an evaluation guide for integrated power grid of electric propulsion systems
  • Develop power distribution systems and frequency converters
  • Establishment of testing/certification procedures of electrically propelled vessel equipment

Development of Turret System for FPSO Operating at Hs 15m Seas

Development of Turret System for FPSO Operating at Hs 15m Seas
Period Jun. 1, 2012~May 31, 2017
Objective
  • Development of Turret mooring system for FPSO operating at Hs 15m Seas
  • Development of Turret main body unit and manifold system capable of connecting over 30 oil & gas transporting risers
  • Development of swivel system for treating products at high pressure over 500 bar